There 's been quite a bit of progress on the outside of the house.
The butt glazed windows have been installed and the scaffolding has been removed now the curved wall has been stained.
The tank is in, and the floor joists for the decking are in place.
Adjacent to the deck is a small shed, perfect for storing outdoor furniture and garden tools.
